Skip to content
All articles

Working in Málaga

Published

How to vet a Málaga corporate residence remotely before you sign

A practical method for assessing a Málaga corporate residence from your desk — what to ask on a video call, which documents to request before signing, and what a corporate housing site inspection should verify once someone is on the ground.

Written by Palacete 10

Most accommodation decisions for an assignment are made by someone who will never see the building. That is normal, and it works, provided the remote assessment is structured. A corporate housing site inspection — whether conducted by you, a local relocation partner or the arriving employee in their first week — should confirm what you were told, not discover it. This article sets out what to verify from your desk, what to put in writing before signing, and what to walk through on the ground.

Establish who you are contracting with before anything else

The first question is not about the flat. It is about the counterparty. Ask for the legal entity name and Spanish tax identification number (NIF), and confirm that this entity is the one that will issue your invoices and hold the agreement. In Spain it is common to encounter an intermediary who markets a property but does not control it, which creates problems when an extension, an early exit or a maintenance dispute arises.

Ask directly: are we contracting with the owner or with an agent, and who is accountable if something fails at 9pm on a Sunday. A single named contact across enquiry, contract and stay is worth more than a slick brochure. At Palacete 10 the agreement is made company to company with the owner, Vamoz Marbella SL, operating on the Costa del Sol since 2013, with one point of contact throughout.

Resolve the commercial and invoicing questions in writing

Finance teams reject accommodation arrangements more often than employees do. Settle these points by email, before a site visit is even scheduled:

  • Invoicing. One monthly invoice or several. Whether it is issued to your company entity, with the correct VAT treatment, and whether it can carry a cost centre, purchase order number or assignment reference.
  • What the rent covers. Utilities, internet, parking, and how consumption above any agreed allowance is handled. Get the mechanism described in the contract, not in an email.
  • Payment. Whether a Spanish bank account is required, what currency is invoiced, and the payment terms your accounts payable team must meet.
  • Duration and change. Under the reformed Ley de Arrendamientos Urbanos (RDL 29/2026), temporary housing tenants have a statutory right to withdraw after one month with 10 days' notice without compensation, and extensions and durations are governed by statutory limits rather than purely contractual terms. Verify that the agreement sets out the justified reason for the temporary stay and complies with these statutory requirements.
  • Multiple placements. If you expect recurring needs, ask whether a framework agreement is possible so that future residences can be secured under pre-agreed terms.

A supplier who answers these clearly within a day is telling you something reliable about how they will behave in month four. Palacete 10 publishes its position on billing, agreement type and multi-residence leasing on the FAQ page, and enquiries are answered within 24 hours.

What a video walkthrough should actually show

Marketing photography is composed. A live video call is not. Schedule one, and ask the person holding the camera to do specific things rather than give a tour:

  • Walk the full route from the street door to the residence door, unbroken, so you see the entrance, the stairs or lift, and the corridors.
  • Open the kitchen cupboards, the fridge and the washing machine. Confirm there is a dryer, and whether it is in the residence or shared.
  • Run a speed test on camera and show you the result, then confirm how the internet is delivered and whether each residence has its own network.
  • Show the heating and cooling controls in each room and confirm they are controlled from within the residence.
  • Open the windows onto the street and stay quiet for thirty seconds. You will learn more about noise in that half minute than from any description.
  • Show the work space. If the building offers a shared work area, see it live rather than in a render, and ask what hours residents may use it.

Ask for the exact address and check it yourself on a map, then measure the journeys your employee will actually make: to the airport, to the main station, to the office or business park, and to a supermarket. Published travel times are a useful shorthand, but verify them against your own route. For reference, Palacete 10 sets out its distances and neighbourhood context in full, including the airport, María Zambrano station and Málaga TechPark.

The inspection checklist for someone on the ground

If a colleague, a relocation partner or the employee themselves can attend, a corporate housing site inspection should test function rather than appearance. Give them a short, specific list:

  1. Access. Complete the entry process exactly as the arriving employee will. If access is keyless, confirm the credential arrives in advance and works without anyone meeting the guest.
  2. Water and power. Run the hot water in every bathroom and the kitchen. Check it reaches temperature and holds it.
  3. Climate. Turn heating and cooling on in each room and confirm both work independently of other residences.
  4. Connectivity. Test the network from the furthest bedroom, not the living room, and from any shared work area.
  5. Noise. Stand in a bedroom with the windows closed during a busy period. Ask about neighbouring residences and what the house rules say about noise.
  6. Laundry, kitchen, storage. Open everything. Confirm the residence is genuinely equipped for a stay of months rather than nights.
  7. Parking. Confirm the space exists, that it is allocated, and how the vehicle enters the building.
  8. Safety and maintenance. Ask who attends a fault, how it is reported, and what the expected response time is.

Where a building has been restored rather than newly built, the relevant question is how the services perform, not how old the façade is. At Palacete 10, the 1908 villa retains its façade, monumental staircase and encaustic floors, while the floors, water and electrical systems, insulation and hot water system are new and high-speed fibre runs throughout. Details of the five residences and what each includes are set out on the residences page, and the shared work suite, parking and house rules are described separately.

Document the outcome

Whatever the inspection finds, write it down and attach it to the file: date, who attended, what was verified, what was outstanding, and the supplier's response. It takes ten minutes and it is the difference between a smooth extension and an argument. It also gives the next person placing an employee in the same city a starting point rather than a blank page.

If Málaga is on your placement list for 2026, we can walk you through the building live and return a written proposal with the commercial terms set out clearly.

Schedule a video call

Tags

  • Global Mobility
  • Corporate Housing
  • Relocation to Málaga
  • Due Diligence
All articles

Updated

Tell us what your team needs

Send your requirements and we will come back within 24 hours with a tailored proposal.

WhatsAppCallRequest availability