Skip to content
All articles

Working in Málaga

Published

Why corporate housing building specification decides how well an employee works on a long placement

On placements of several months, the fabric of the building — acoustic separation, insulation, ventilation and dedicated fibre — does more for an employee's productivity than the furniture does. Here is what to ask a housing supplier before you sign.

Written by Palacete 10

What to look at before you look at the photographs

When you are assessing accommodation for a placement that runs for months rather than nights, the corporate housing building specification tells you more about how the assignment will go than the interior photographs do. Photographs show taste. Specification shows whether an employee can take a video call at nine in the morning without a neighbour's washing machine in the background, sleep through a summer night without a portable air-conditioning unit, and keep working when the building's shared connection is saturated at six in the evening.

This matters commercially, not just pastorally. The costs of a placement that goes wrong — an early return, a re-mobilisation, a replacement hire — dwarf any difference in monthly accommodation cost. Most of the accommodation complaints that reach an HR inbox are not about design. They are about noise, temperature, stale air and internet. All four are properties of the building, and none of them can be fixed by the resident after arrival.

Acoustics: the complaint that arrives in month two

Noise is the failure mode that takes longest to surface and is hardest to remedy. In the first fortnight an employee is busy and tolerant. By week six, footsteps from the residence above at half past six in the morning have become the reason they are not sleeping properly, and sleep quality is the single clearest driver of cognitive performance on a long assignment.

The relevant question is not whether the building is quiet when you visit, but how it is built between units. Ask specifically about separation between residences rather than about glazing, which suppliers tend to volunteer because it is easy to point at. Floating, sound-insulating floors between residences address impact noise — the transmitted thud of walking, dropped objects and furniture being moved — which is the category that generates most complaints and which double glazing does nothing about. In older buildings this is exactly the detail that a genuine restoration addresses and a cosmetic refit does not.

A second acoustic question is worth asking where the accommodation includes shared working space: is it separated from the residences, or is it a corner of a lobby? A work suite that carries sound into someone's bedroom is a source of friction between residents in the same company.

Insulation and climate: the difference between a good building and a hot one

Málaga's climate is one of the reasons assignees are pleased to be posted here, and it is also a specification problem. A building with poor thermal performance in southern Spain becomes uncomfortable from late spring, and split units working hard against a badly insulated envelope are noisy, expensive and uneven.

What you want to establish is the order of operations: was the envelope upgraded before the climate system was chosen? Upgraded wall and roof insulation holds a constant indoor temperature with far less mechanical effort, which in turn means quieter operation and lower running cost. Where utilities are managed by the operator, as they are in a well-structured corporate housing arrangement, this shows up on your side of the deal too — an efficient building is a more predictable one to budget for.

Aerothermal heating and cooling, which is what a modern retrofit in this climate usually specifies, delivers both heating and cooling from the same low-energy system and can be run concealed rather than as visible wall units. For a long placement, the practical benefit is simply that the residence stays at one temperature without the resident thinking about it.

Ventilation: air quality and the sealed-building problem

Good insulation and airtightness create a second requirement. A well-sealed residence with no mechanical ventilation gets stuffy, and a stuffy room is a measurably worse place to concentrate — elevated indoor CO₂ is associated with reduced decision-making performance. The usual workaround is opening a window, which in a city means traffic noise, and in August means losing the cooling.

Mechanical ventilation with heat recovery solves both at once: a continuous supply of fresh air, tempered by the air being extracted, without draughts and without opening anything. It is an unglamorous line on a specification sheet and one of the items with the most direct bearing on how someone feels at four in the afternoon. Ask whether ventilation is mechanical and whether it recovers heat. If the answer is that the windows open, you know what you are buying.

Per-residence fibre, not building-wide Wi-Fi

Internet is where the gap between residential and corporate expectations is widest. Most furnished accommodation offers a shared connection distributed around the building. That is adequate for browsing and inadequate for a project manager on a four-hour call while three neighbours stream video.

For corporate use, ask two questions. First, is the connection dedicated to the residence or shared across the building? A dedicated fibre line per residence removes contention entirely and gives your IT team a clean network to reason about. Second, does the employee's VPN work, and who is accountable when it does not? A single operator who owns the infrastructure can answer that. A listings platform cannot.

At Palacete 10 the specification reflects this priority set: a restored 1908 villa where the façade, the monumental staircase and the encaustic floors were kept, while insulation, acoustic floating floors, aerothermal climate control, heat-recovery ventilation and private fibre per residence are new. Each of the five residences has its own fibre connection, and the residents-only 24/7 work suite runs on the same infrastructure.

The questions to put to any supplier

Use these when comparing options, and put the answers in writing:

  • Is there acoustic separation between residences, and does it address impact noise from floors above?
  • Was the thermal envelope upgraded, and what system provides heating and cooling?
  • Is ventilation mechanical, and does it recover heat?
  • Is the internet connection dedicated per residence or shared across the building?
  • Who is accountable operationally when something in the building fails, and how fast do they respond?
  • Are utilities managed by the supplier and active on arrival, and is there a single VAT-compliant invoice?

The last two matter because specification is worth little without an operator behind it. One supplier, one contract and one monthly IVA invoice is what turns a well-built building into a placement your finance team does not have to chase. Lease terms are agreed per contract; practical points on leasing and invoicing are set out in our frequently asked questions.

Request a corporate proposal — enquiries are answered within 24 hours.

Tags

  • Global Mobility
  • Corporate Housing
  • Employee Experience
  • Building Specification
All articles

Updated

Tell us what your team needs

Send your requirements and we will come back within 24 hours with a tailored proposal.

WhatsAppCallRequest availability